Custom electric bicycle prototype being assembled in a development workshop
Customization service

OEM / ODM ebike customization, from frame geometry to packaging

Choose an existing platform and adapt it to your brand, or start from a clean sheet with our engineering team. Both routes run through the same factory, the same inspection gates and one account manager.

Two ways to work with us

Adapt a platform, or develop a new one

Both routes run through the same assembly lines, the same six inspection gates and one dedicated account manager from brief to shipment.

odm

ODM — adapt an existing model

Take one of our production platforms and change the parts that carry your brand identity.

  • Paint colour, decals and logo placement
  • Saddle, grips, tyres and rim upgrades
  • Display language and assist level tuning
  • Retail packaging, manual and carton marking
Lead timeSample 15 - 20 days, bulk 30 - 40 days
oem

OEM — develop a new model

Full development programme where frame geometry, motor mapping and battery layout are designed for your market.

  • Frame geometry and tube set development
  • Motor selection and controller parameter mapping
  • Battery pack design with UN38.3 documentation
  • Certification testing to CE, EN 15194 or UL 2849
Lead timePrototype 45 - 60 days, bulk 45 - 60 days after approval
What can be customized

Six dimensions, controlled in house

Frame welding, painting, motor mapping, wheel building and packaging are all handled inside our facility, so changes do not depend on third-party schedules.

  • Frame geometryTube set, frame sizes, step-through or step-over, cargo deck length.
  • Paint and decalsCustom Pantone colours, matte or gloss finish, water-slide decals.
  • Motor and batteryHub or mid-drive, 250W to 750W, battery capacity and cell brand.
  • Wheels and componentsRim size, tyre brand, groupset level, saddle, grips and pedals.
  • Display and softwareLCD or TFT, assist levels, speed limit, Bluetooth app option.
  • Packaging and manualsRetail carton, foam protection, multilingual manual, barcode labels.
Custom paint colour swatch panels for OEM ebike frames

We sign NDA agreements before any drawing or specification exchange. Custom moulds, frame drawings and brand artwork remain the property of the client who funded the development, and are not reused for other buyers.

How a project runs

From brief to bill of lading in six steps

Each step has a named owner on our side and a written deliverable, so you always know what is happening without chasing updates.

  1. 012 - 3 days

    Requirement brief

    You share target market, price point, specification and volume. We reply with a feasibility note.

  2. 023 - 5 days

    Proposal and quotation

    Detailed BOM, tooling cost if any, unit price by volume tier and delivery schedule.

  3. 0315 - 60 days

    Sample build

    Pre-production sample built to the agreed BOM and shipped for your evaluation.

  4. 04As required

    Sample confirmation

    You approve the sample or request revisions. Signed approval locks the specification.

  5. 0530 - 60 days

    Bulk production

    Frame welding, painting, assembly and six inspection gates with weekly photo updates.

  6. 065 - 10 days

    Inspection and shipment

    AQL sampling, container loading plan, certification documents and bill of lading.

Commercial terms

Clear conditions before we start

Standard terms below. Everything is negotiable against volume, project scope and payment structure.

OEM and ODM commercial terms
MOQ30 units for stock models, 100 units for custom paint, 300 units for new frame development
Sample policySample cost charged, refundable against the first bulk order above MOQ
Payment terms30% deposit by T/T, 70% balance against copy of B/L; L/C at sight negotiable
Trade termsFOB Shanghai or Ningbo, CIF and DDP available on request
Lead time30 - 40 days for repeat orders, 45 - 60 days for first custom programmes
WarrantyFrame 3 years, motor and battery 1 year, free replacement parts on confirmed claims

Prices, MOQ and lead times shown on this site are indicative and confirmed in writing with each quotation. Certification availability depends on the target market and the final specification.

Start your project

Send us your brief

Attach your target specification, price point and annual volume. We return a feasibility note within three working days, including any tooling cost and a first-pass BOM.

We reply within one business day. Your details are used only to answer this inquiry.

Prefer to talk? See all contact channels

Prefer to talk it through first?

Book a video call with our engineering team. We can walk through frame options, motor mapping and certification routes for your target market.